2.0MW
HPP ECOSYSTEM →
Own a lifetime share of a hydropower plant production capacity incorporated by blockchain technology and implemented by the ERC-721 contract (NFT). We created a collection of 10k NFTs that represent 50 % ownership of the 2 Megawatt hydropower plant.

1 NFT equals 1 of 10,000 shares of the hydropower plant and the mining hotel for the lifetime profits paid in USD, ETH, BTC.

17,280,000 kW/h annual production
Annual Revenue from electricity sale = $1,209,600
Annual Revenue from mining = 576 ETH
By purchasing HPP NFT you are getting lifetime ownership of a community-owned 2.0 MW hydro power plant. The profits will be distributed among holders each month paid in BTC, ETH, USDT.

Every decision on Power Plant’s operations, contracts, and financial obligations will be voted by our community.
Power Generated
AFFILIATED PROJECTS
Rivermap
DAO HYDROPOWER PLANT
First community-owned decentralized hydropower plant that will serve the cryptocurrency mining and blockchain community.
$1.5M
800 ETH
Dec. 22'
Invested by now
Fundraising Goal
Fully operational
  • Modify 2 underground water channels
  • Order and buy turbine, a generator, and electrical system
  • Finalize 2 water dams
  • Install 3 feeding pressure pipes
  • Finish the building of a mining hotel
BENEFITS OF OWNERSHIP
PROPERTIES, PLANT, AND EQUIPMENT
  • Lifetime ownership of the 2.0 MW HydroPower Plant
  • Member's - only access to cloud mining
  • $0.02 per kWh energy access for the NFT holder
  • Exclusive access to your HPP 4kx4k file
  • Free accommodation at the guest house at the Plant site (meals not included)
Crypto Miners Syndicate
ORDERING GENERATORS
MODERNIZING STRUCTURES
Upgrading the underground water canals and turbine building
GENERATOR INSTALLATION
Installing the generator, automatic control and monitoring equipment
TESTING AND MINING
Testing and mining the cryptocurrency
1
2
3
4
HOW IT WORKS
A growing network of DAO HPP
REQUIRED INVESTMENT
Ordering electrical generators from CINK Hydro Energy
WHITELIST REGISTRATION
Underground water channel from “Ak-Suu” (3km long)
Sand trap on river “Ak-Suu”
Water dam on river “Ak-Suu”
Pressure basin
3 main feeding pressure pipes
Underground water channel from "Arashan" (4km long)
Sand trap on river “Arashan”
Water dam on river “Arashan”
HPP ECOSYSTEM →
Own a lifetime share of a hydropower plant’s production capacity incorporated by blockchain technology and implemented by ERC-721 contract (NFT). We created a collection of 10k NFTs that represent 50 % ownership of the 2 Megawatt hydropower plant.

1 NFT equals to 1 of 10,000 shares of the hydropower plant and the mining hotel for the lifetime profits paid in USD, ETH, BTC.

17,280,000 kW/h annual production.
By purchasing HPP NFT you are getting lifetime ownership of a community-owned 2.0 MW hydro power plant. The profits will be distributed among holders each month paid in BTC, ETH, USDT.

Every decision on Power Plant’s operations, contracts, and financial obligations will be voted by our community.
Power Generated
AFFILIATED PROJECTS
RIVERMAP
DAO HYDROPOWER PLANT
First community owned decentralized hydro power plant that will serve the cryptocurrency mining and blockchain community.
800 ETH
Dec. 22'
Fundraising Goal
Invested by now
Fully operational
  • Modify 2 underground water channels
  • Order and buy turbine, a generator, and electrical system
  • Finalize 2 water dams
  • Install 3 feeding pressure pipes
  • Finish the building of a mining hotel
BENEFITS OF OWNERSHIP
PROPERTIES, PLANT, AND EQUIPMENT
  • Lifetime ownership of the 2.0 MW Hydropower Plant
  • Member's - only access to cloud mining
  • $0.02 per kWh energy access for the NFT holder
  • Exclusive access to your HPP 4kx4k file
  • Free accommodation at the guest house at the Plant site (meals not included)
TEAM
Crypto Miners Syndicate
ORDERING GENERATORS
MODERNIZING STRUCTURES
Upgrading the underground water canals and turbine building
GENERATOR INSTALLATION
Installing the generator, automatic control and monitoring equipment
TESTING AND MINING
Testing and mining the cryptocurrency
1
2
3
HOW IT WORKS
REQUIRED INVESTMENT
Ordering electrical generators from CINK Hydro Energy
4
WHITELIST REGISTRATION
Underground water channel
from river “Ak-Suu” (3km long)
Sand trap on river “Ak-Suu”
Water dam on river “Ak-Suu”
Pressure basin
3 main feeding pressure pipes
Underground water channel
from river “Arashan” (4km long)
Sand trap on river “Arashan”
Water dam on river “Arashan”
$1.5M
2.0MW
A growing network of DAO HPP
© 2022 Watt Technologies LLC
© 2022 Watt Technologies LLC